Feiying New Tether Power Compatible Dji M4td Drone Power System, Providing Long Endurance Uninterrupted Power Supply Wiith High-Power Floodlight. G12-55m-L6

Customization: Available
Input Voltage: 190~240VAC
Output Voltage: 600~850VAC

Product Description

Basic Specifications
Model NO.
G12-M4TD 55m
Net Weight
4.8kg
Cable Weight
5G/M
Cable Length
Customize
Transport Package
Wheeled Aviation Case
Specification
D275×W146×H200±0.5mm
Origin
China
Capacity
3000
Technical Parameters
◈
Support flight altitude: 33~55m (tether cable 33/55m, reserved safety length)
◈
Supported flight duration: ≥24h
◈
Portability: Small size, lightweight, backpack storage, easy to carry
◈
Automatic Operation: No need to operate the tether box for take-off and landing. Automatic take-up with backup battery support.
◈
Stabilization: Voltage stabilisation of the air module, preventing battery drop or recharge issues.
Tether Power System 1
Tether Power System 2
Product Technical Highlights
DJI M4TD G12
Tethered power supply for long flight: Continuous flight ≥24h, constant voltage output.
Automatic take-up and pay-off: Easy to operate during take-off and landing.
Rich Load, Unlimited Expansion: Supports Gimbal cameras, floodlights, searchlights, and shouting devices.
Highly protective: IP54 rating for wide range environmental adaptability.
Comprehensive protection: Separation of strong/weak power, automatic protection in case of failure.
General Specifications
System Overview
Compatible ModelsDJI Matrice 4TD
Flight Altitude30m or 50m (Cable: 33m or 55m)
Safety FeaturesContactless operation, high-voltage isolation, synchronized auto-retract
EnvironmentWorking: -20~45℃, Protection: Air IP54 / Ground IPx4
Packing sizeD495×W410×H220mm, Weight: 3kg
Tethered Box (Ground Module)
Input Voltage190~240VAC, 50/60Hz
Output Power1200W (Rated) / 1500W (Peak)
Reel Speed0~3m/s Intelligent dynamic adjustment
Data DisplayVoltage, current, temperature, power, length, operating time
Cable MaterialSilver-plated copper + Teflon + Kevlar weaving
Certifications
Certifications
FAQ
● Are you a factory or a trading company?
We are a manufacturing factory with over 10 years of production experience specializing in intelligent equipment.
● How to place an order?
Inquiry with us → Inform us of usage scenario → Receive product design recommendations → Confirm sample → Sign contract/Deposit → Mass production → Delivery.
● What transportation methods are available?
Express delivery, air freight, and sea freight are all supported based on your specific requirements.
● What is the production and shipping lead time?
The typical delivery time is 15-20 working days, depending on the order quantity.
● How to confirm payment matters?
We accept telegraphic transfer (T/T) and other standard payment methods. Please contact us to confirm before making payment.
● What if items are missing from my package?
Please contact our support team immediately. We will verify your order information and arrange for compensation delivery.
Footer Banner

Related Products